Your Position: Home > News > Report

Copper wire drawing machine installation and transmission structure

2015/11/15      view:
The installation of copper wire drawing machine 1, by mechanical technical workers according to the foundation diagram to install equipment. 2, according to the principle of electrical wiring and wiring diagram. 3, the machine power by three phase four wire 380 v50hz power supply. Copper wire drawing machine, equipment installation, commissioning and operation 1 check circuit is correct, close the power switch. 2, start the main motor, the new FM potentiometer, make the motor running, the motor running direction and the direction of the machine requirements are consistent, make the machine run for 30 minutes, see whether the machine is normal, with or without abnormal noise, if have abnormal murmurs have downtime for inspection. 3, inching switch pedal, see the machine running at whether appropriate. The line in 4, start motor, adjust the torque controller take-up torque motor rotating knobs, check whether the line running normally, the motor fan rotation direction is correct inversion easy to burn out main motor (fan), adjust the discharge line, add lubricating oil. 5, light poles in lead width line and the line line line of linear velocity