The installation of copper wire drawing machine 1, by mechanical technical
workers according to the foundation diagram to install equipment. 2, according
to the principle of electrical wiring and wiring diagram. 3, the machine power
by three phase four wire 380 v50hz power supply. Copper wire drawing machine,
equipment installation, commissioning and operation 1 check circuit is correct,
close the power switch. 2, start the main motor, the new FM potentiometer, make
the motor running, the motor running direction and the direction of the machine
requirements are consistent, make the machine run for 30 minutes, see whether
the machine is normal, with or without abnormal noise, if have abnormal murmurs
have downtime for inspection. 3, inching switch pedal, see the machine running
at whether appropriate. The line in 4, start motor, adjust the torque controller
take-up torque motor rotating knobs, check whether the line running normally,
the motor fan rotation direction is correct inversion easy to burn out main
motor (fan), adjust the discharge line, add lubricating oil. 5, light poles in
lead width line and the line line line of linear velocity